NO.DESIGNATION OF OPERATIONTIME REQUIRED
1Piloting of the vessel (ice-breaker assistance and pilotage
from roads to moorings and backwards)
Winter – 14 hours
Summer – 10 hours
2Mooring and disconnection of vessels with capacity (for both
operations) 90 – 140 thousand tons
6 hours
3KPP commission work on registration of the call and
departure of the vessel
2.5 hours
4Preparation of cargo plan, coordination with dispatcher of
OOO “Spetsmornefteport Primorsk”
20 minutes
5Preparation of ship mains before and after loading and
informing dispatcher of OOO “Spetsmornefteport
Primorsk” about it
30 minutes
6Hosing in or out (per one loading arm)30 minutes
7Pressuring of the loading arms30 minutes
8Inspection and acceptance of cargo tanks and sampling from
the tanks with isolated ballast
1 hour
9Analysis of ballast water samples2 hours
10Filling in and signing of the safety control form (check list) on
the ship for cargo and bunkering operations
20 minutes
11Setting/removing floating booms (order) round the tanker
during summer navigation.
NOTE: Combined with the KPP commission work on
registration of the call and departure by the terminal
combined with hosing in if the call is registered on roads
1 hour and 30 minutes
12Sampling, chemical analysis, measurement and metering of
loaded batch of oil acc.to SIKN Х°No.725, 726
(Terminals No.1, No.2), SIKN No.727, 728 (Terminals No.3,
No.4).
Sampling, chemical analysis, measurement and
metering of loaded batch of oil on the ship.
2 hours
13Filling out the act of transfer-acceptance of oil with
attachment of oil quality passport (certificate) and putting on
the act
the identifications of the customs office representative
30 minutes
14Filling out the cargo documents for oil delivered by the
captain post (timesheet, bill of lading etc.).
NOTE: Estimated time since the issues concerned with
ensuring safe navigation cannot be restricted by time. The
place of taking the pilot on board and respectively speed of
piloting depends on the ship’s tonnage and weather conditions
3 hours